I am trying to understand the (Q,R) inventory policy with a type 1 service level and demand and lead time modelled as normal distributions. As far as I have understood, the assumption is that the quantity Q that we order is completely delivered when the order arrives, i.e., no allowance is made for defective products or disruptions from the supplier's side. The policy inherently assumes that an order can be placed whenever the reorder point is reached and a quantity Q will be delivered after a certain lead time.
Are there models or case studies for calculating safety stock that take into account supplier-induced disruptions such as defective batches or probability of failure of manufacturing equipment?