Skip to main content
added 12 characters in body
Source Link
TheSimpliFire
  • 5.5k
  • 5
  • 23
  • 56

I want to add a KPI to calculate the percentage of occupancy of vehicles (: the total of travel time of occupied arcs (where the capacity of a vehicle different of zerois non-zero) over the total travel time. 

How can I represent that consideringusing three variables  : the xij$x_{ij}$ variable equal to 1$1$ if there is an arc between i$i$ and j $j$, the qi$q_i$ the capacity of vehicle after serving vertex i$i$ and the bi$b_i$ the starting time of service for vertex i.$i$?

I want to add a KPI to calculate the percentage of occupancy of vehicles ( the total of travel time of occupied arcs ( the capacity of vehicle different of zero) over the total travel time. How can I represent that considering three variables  : the xij variable equal to 1 if there is an arc between i and j , the qi the capacity of vehicle after serving vertex i and the bi the starting time of service for vertex i.

I want to add a KPI to calculate the percentage of occupancy of vehicles: the total travel time of occupied arcs (where the capacity of a vehicle is non-zero) over the total travel time. 

How can I represent that using three variables: the $x_{ij}$ variable equal to $1$ if there is an arc between $i$ and $j$, the $q_i$ the capacity of vehicle after serving vertex $i$ and the $b_i$ the starting time of service for vertex $i$?

Source Link
Nada.S
  • 429
  • 2
  • 8

KPIs in Docplex?

I want to add a KPI to calculate the percentage of occupancy of vehicles ( the total of travel time of occupied arcs ( the capacity of vehicle different of zero) over the total travel time. How can I represent that considering three variables : the xij variable equal to 1 if there is an arc between i and j , the qi the capacity of vehicle after serving vertex i and the bi the starting time of service for vertex i.