7 votes
Accepted

Relevance of order of model construction in CP-SAT

This is a well know behavior of all MIP/CP solvers. Presolve and search are heavily heuristics based (to limit the complexity of the underlying algorithms), and thus are dependent on variables and ...
Laurent Perron's user avatar
5 votes
Accepted

OR-Tools CP-SAT solver: is it possible to name a constraint like in GUROBI

Setter: ct = model.Add(x == 2).WithName("my_ct") Getter: ct_name = ct.Name()
Laurent Perron's user avatar
5 votes

CP-SAT's `NumBooleans()` parameter

This does not count Boolean variables in the model. It counts Boolean variables in the SAT solver. This is vastly different. Presolve is happening, some constraints are expanded, search and conflicts ...
Laurent Perron's user avatar
4 votes
Accepted

CP-SAT _ Summing variables under conditions

A few hours after posting my question here I found a concept I was not familiar with called channelling : https://github.com/google/or-tools/blob/stable/ortools/sat/docs/channeling.md I used it for my ...
ooo's user avatar
  • 119
4 votes

how to count the number of values that are greater than zero in OR-Tools

You can a look at this doc. You will create one Boolean variable per integer variable, and sum them.
Laurent Perron's user avatar
4 votes

Google-OR Tools: Assignment minimizing overlapping members

The MIP model by Erwin Kalvelagen is a good way to solve the problem, and is probably quite efficient. As an alternative, the following MiniZinc model is a fairly straight-forward model based on the ...
Zayenz's user avatar
  • 196
3 votes
Accepted

Google-OR Tools: Assignment minimizing overlapping members

It is often a good idea to split this task into two parts: Developing a mathematical model Implement the model (coding) Often, if you do a good job on (1), (2) becomes a breeze. Here is my attempt. ...
Erwin Kalvelagen's user avatar
3 votes

Non integer linear objective in or-tools CP-SAT

CP-SAT accepts floating point coefficients in the objective. It applies the necessary scaling to do all computation with integers, and report the unscaled objective. It also displays in the log some ...
Laurent Perron's user avatar
3 votes
Accepted

Using binary variable or integer variable in Constraint Programming (CP)?

For the CP-SAT solver, the rule of thumb is the following: if you need to check if a variable ==/!= value, then you should use an array of Boolean variables instead the start, end, size of interval ...
Laurent Perron's user avatar
3 votes
Accepted

About circuit constraints in OR - tools

The graph is defined by the arcs you pass. An arc is (start node, end node, literal) If the literal is true, the arc is selected....
Laurent Perron's user avatar
3 votes
Accepted

Force gaps between tasks, tasks are scheduled within their job's time windows in Jobshop problem

Here is a working version of your code: You need to change the objective. The obvious optimal is not to schedule any job. You need to add a 0 -> 0 arc to ...
Laurent Perron's user avatar
3 votes
Accepted

Simple Constraint Programming Problem: docplex works but equivalent ortools model is infeasible

Please read this doc section cp-sat prefers Boolean variables. Here is a c++ version.
Laurent Perron's user avatar
3 votes
Accepted

Circuit constraint leading to infeasibility if there are 0 jobs producable one a machine

you need to add a self arc 0 -> 0 with a Boolean variable indicating if the circuit is empty. For for all tasks, add the implication (circuit is empty => task is not performed). ...
Laurent Perron's user avatar
3 votes

Google CP-SAT Infeasible ILP for Large Problem Area

With 256, I get the optimal solution quite fast. With > 256, I get the following error: ...
Laurent Perron's user avatar
3 votes
Accepted

Modeling Multi-Agent Collision in Google CP-SAT Solver

Here is my proposal: for each arc: (one vertical or horizontal segment of an path) create a start variable compute a min duration create a end variable create an variable interval with those 3 ...
Laurent Perron's user avatar
2 votes
Accepted

Parallel scheduling with precedence constraints and variable job length

If you search for literature on job shop scheduling with sequence-dependent setups, I think you will find what you want. As the phrase suggests, sequence-dependent setups refer to lost time and/or ...
prubin's user avatar
  • 37.9k
2 votes
Accepted

"Complex" scheduling problem model structure

So, with a great help of Mr. Perron I understood my own assignment! Basically I was linking my OptionalIntervals to the particular points in time, making it time and memory consuming. I really thought ...
Gleb S's user avatar
  • 51
2 votes

RAM overflow when scheduling 1000+ intervals

A stack overflow does not necessarily mean that you ran out of RAM usually being out of RAM throws a java.lang.OutOfMemoryError: Java heap space. To verify this, ...
worldsmithhelper's user avatar
2 votes
Accepted

CP-SAT solver doesn't use all space available for scheduling

Once again, the objective does not incentive scheduling tasks. So you rely on the randomness of the multi threaded search
Laurent Perron's user avatar
2 votes
Accepted

Team Orienteering Problem with Time Windows infeasible using CP-SAT solver in Google OR-Tool

I enabled logging: solver.parameters.log_search_progress = True Unfortunately, nothing jumps out. The model is proven infeasible during presolve. You should look ...
Laurent Perron's user avatar
2 votes
Accepted

What exactly does the AddHint() method in Google OR-Tools' CP-SAT solver do?

The hints are actually wrong and infeasible. A good way to check it is to add the parameter fix_variables_to_their_hinted_value:true to the solver before solving. ...
Laurent Perron's user avatar
1 vote

Google-OR Tools: Assignment minimizing overlapping members

The original data mises the team 9,16 (these two do not belong to any team) The code in OR-TOOLS Data ...
Optimization team's user avatar
1 vote
Accepted

Formulating assignment problem with people attributes that need to be balanced per assignment attribute in or-tools, CP-sat

You'd need two optimization variables Binary $ x_{s,r} = 1$ if student $s$ from set A is matched with row $r$ from set B Binary $ y_{s,c} = 1$ of student is matched to a class $c$ Derived sets/matrix ...
Sutanu Majumdar's user avatar
1 vote

Scheduling optimization, Adding 4 day same shift and 3 day off weekly constraint

Not sure why this question was abandoned but I'll give it a try: Two vars: binary $x_{e,s,d}=1$ if employee $e$ alloted to shift $s$ on day $d$ & another binary $o_{e,d} = 1$ if off for day $d$ ...
Sutanu Majumdar's user avatar
1 vote
Accepted

Google CP-SAT Infeasible ILP for Large Problem Area

So the issue here is that I have overconstrained the model. I am constraining the relationship between out_degree and in_degree while simultaneously constraining the actual value of ...
Raghav Thakar's user avatar
1 vote

or-tools: job shop problem never exists not finding additional solutions

Proving optimality is where the NP-Hard part is. A lot of small job-shops are still open (meaning not proven). In your case, you have a maximization objective. You have found a feasible value with ...
Laurent Perron's user avatar
1 vote
Accepted

Circuit constraint respecting the order of the next n jobs / jobs on each machine starting at 0

for 1) Look at this literal in the jobshop with setup times. You just need to add: model.Add(start_of_job == 0).OnlyEnforceIf(start_lit) For 2) For each color, add ...
Laurent Perron's user avatar
1 vote

Parallel scheduling with precedence constraints and variable job length

First of all, if in the problem there is a specific precedence constraint for each job, let's say each job has its specific route, your problem sounds like (...
A.Omidi's user avatar
  • 8,450

Only top scored, non community-wiki answers of a minimum length are eligible