0 votes
1 answer
57 views

Scheduling: Connecting the end and the beginning of the planning horizon

I would like to create a rota that repeats every 28 days and adheres to the usual rules. These include the minimum/maximum number of consecutive working days and the break days. I have created a model ...
0 votes
1 answer
106 views

How to linearize the waiting time

My question is this: I want to express the time it takes for multiple servers to complete tasks for multiple users. I divide the time into $t$ time slots, and each task may occupy multiple time slots. ...
3 votes
1 answer
205 views

Best known results on the flexible jobshop benchmarks

Is there a website that compiles the best known results on the flexible jobshop problem ? I know there was a blog post/article by Quintiq, a (deleted) blog post on CP Optimizer, some more recent ...
8 votes
1 answer
247 views

Workforce Scheduling problem - Modelling to minimize resources

I am working on a scheduling program for a service desk. I want to decide the number of people required to come in at each shift. The data I have is: There are 4 overlapping shifts Arrival pattern at ...
2 votes
1 answer
67 views

Workforce scheduling problem difficulty

I am working on a workforce scheduling MIP -- given a set of shift candidates (different shapes and sizes of shifts created out of labor demand) and a set of workers, optimally assign the shifts under ...
0 votes
2 answers
63 views

Problem 8.17 of Korte and Vygen

An airline wants to conduct a given set of scheduled flights with as few airplanes as possible. All available airplanes are of the same type. For each flight we know the departure time and the flight ...
1 vote
0 answers
35 views

Execution time of sequential asynchronous process and division of labour

I wasn't sure if I should put this question here, but I guess is as good as any. When we have a sequential process that has a number of tasks, were each task requires the previous one to be completed, ...
1 vote
2 answers
89 views

In a routing and scheduling problem with break consideration, How can I determine whether a node is met before a break or after it?

I'm working on a routing and scheduling problem in the home care services context. I consider a break as a dummy patient, so routing and scheduling are also implemented for the break node (with some ...
0 votes
2 answers
136 views

Linear Programming - Model understaffing

I am reading up a bit on Linear Programming and have taken a lot from "Scheduling Emergency Room Physicians" (by Michael W. Carter & Sophie D. LaPierre, Health Care Management Science 4, ...
2 votes
1 answer
248 views

Replace the constraint using ==> by a linear formulation

I would like to know how to express the continuity constraint without using a decision variable in the conditional form. My challenge is to stay with a linear formulation. I will start to explain my ...
0 votes
1 answer
44 views

Circular queue modeling

Let $P$ be a set of discretely interruptible processes/tasks; $T_i \in \mathbb{N}$ be the running time of process $i \in P$; And $\tau \in \mathbb{N}$ be the maximum amount of time a process can use ...
2 votes
0 answers
50 views

Implement a rolling horizon approach into a schedulig problem

I have just come across the topic of 'Rolling Horizon' in my literature research and would now like to apply it myself, but unfortunately I don't know where to start. This is my model, which is ...
2 votes
1 answer
231 views

How to modify a model to be cyclic?

I have the following question. I have the following physician problem with the indices $I$ (doctor), $T$ (days) and $J$ (shifts). $x_{itj}$ is the decision variable, $d_{tj}$ is the demand and $g$ is ...
2 votes
2 answers
318 views

How to model weekend constraints in a nurse rostering problem?

I have the following problem. I have a Nurse rostering problem and want to model the following. I have the indices $D$ (days), $I$ (nurse), $S$ (shift). My planning period $D$ is 28 days. Now I want ...
1 vote
1 answer
78 views

What is a good approach to deciding which jobs (from a list of HPC jobs) should be ran locally vs. on the cloud given time & cost constraints?

Cloud computing has transformed the landscape of compute operations. Of course, there are still many labs/businesses with local, large-scale compute clusters. For those businesses who keep the ...
3 votes
3 answers
300 views

Scheduling for the shortest days using ILP

I've tried Or-Tools and MILP solvers a couple of different ways on this, but they take a surprisingly long time to realize that the solution they generated fairly quickly is in fact minimal. Is there ...
1 vote
1 answer
153 views

Job Scheduling with Energy Consumption using Linear Programming

I'm looking for some advice for an optimization problem regarding scheduling jobs in a datacenter. So I have a list of jobs and each job has a required time for finishing and a number of cores it has ...
1 vote
1 answer
97 views

Scheduling repeated tasks with minimum duty cycles

Several tasks need to run repeatedly in a channel, one at a time, over a repeating time frame of length $T$. Associated to each task $i$ is the duration $L_i$ the task will take to run, and a maximum ...
1 vote
0 answers
225 views

Modified bus scheduling problem question in ortools

Has been crossposted in stackoverflow. I want to solve the bus scheduling problem using ortools with some minor modifications. In my case, the max number of drivers is known. The modifications I would ...
6 votes
0 answers
162 views

Modelling issue with precedence constraint in OR-Tools

I'm trying to solve an RCPSPDc model It is infeasible, although Ilog Cplex solves it, so I think I have a modelling issue. I have more constraints but the precedence is the one that makes it ...
0 votes
0 answers
55 views

Workforce scheduling optimization using ML model output

I am working on a workforce scheduling problem where we want to come up with an intelligent way to identify a set of shift candidates that is just enough to cover all labor demand but also flexible ...
9 votes
1 answer
287 views

How to tackle large nurse scheduling problem?

I have a nurse-scheduling type of problem with a time span of a year and many employees. Formulation My main variables are: \begin{align}x_{e,t} &= \begin{cases}1 \text{ if employee } e \text{ ...
7 votes
2 answers
403 views

Why most of constraint solvers do not support optional intervals?

Optional interval is a great idea of optional interval/task that can be active or inactive based on boolean variable. I found it very useful in complex scheduling problems. It was introduced in IBM Cp ...
1 vote
0 answers
380 views

Adding sequence constraints to the assignment problem- Python

This is an online assignment problem and yet can be considered as an assignment problem with a sequence. Assume that workers are coming into the system sequentially and I want to assign a task to them ...
5 votes
2 answers
199 views

How to combine MIP solver with a CP one?

I am working on the scheduling problem in the class of parallel resource scheduling models. When I have studied some papers regarding that, I see the method that combines an MIP with a CP. The ...
1 vote
2 answers
102 views

Modeling of a special form of the precedence constraint

There exists a scheduling problem in which some tasks should be processed on some resources. Additionally, each task needs to be assigned to a specific position on each resource. Let the decision ...
1 vote
2 answers
158 views

Workforce scheduling problem

I am working on a employee scheduling problems (assigning shifts to temporary workers) by modeling it as a MIP. There is a one shift per day constraint for the employees. There are overnight shifts ...
2 votes
1 answer
78 views

Compute time between tasks

I am trying to solve an optimization problem in which there is a set of tasks, $S$, where $s_i$ and $e_i$ are the starting and ending time of task $i \in S$. Each task $i $ must be done within its own ...
1 vote
1 answer
109 views

Scheduling & Routing Problem

Looking for some advice on how to approach this combo scheduling + routing problem. I am a supply chain OR consultant, and was recently approached by a potential client. Without giving too much away, ...
0 votes
0 answers
86 views

Pyomo + Gurobi Scheduling Tasks within Working Hours

I initially posted this on stackoverflow and got redirected here. You can view the old post with formatted tables here: StackOverflow Post I have a python schedule optimization script using pyomo and ...
2 votes
0 answers
28 views

The facet-defining inequalities for a single resource scheduling problem

Suppose, there exists a scheduling problem $S$, in this case a single resource, with the following descriptions: $$ \text{conv(S)} = \{x \in \mathbb{R}^n \ | \ \forall \lambda_{i} \in \mathbb{R}^{n+}, ...
1 vote
1 answer
114 views

Can dynamic programming find globally optimal solutions for scheduling problems

I want to know if dynamic programming can generally find globaly optimal solutions for scheduling problems? I think this might be difficult as dynamic makes one at a time decisions without calculating ...
1 vote
1 answer
123 views

Mixed-Integer Programming Model for Scheduling with Dynamic Jobs

I have an optimization problem for deliveries between production lines and a warehouse in a small facility. I need to know how many vehicles and utilities to buy, such that cost and downtime are ...
1 vote
1 answer
152 views

Is this classed as a version of jobshop? How should it be approached?

I'm looking at a problem that seems quite like flexible jobshop, but as I understand it jobshop is basically all about finding the order/sequence of tasks (across multiple machines potentially), ...
2 votes
1 answer
78 views

How to define the sequence depending setup time based on a time index formulation

I am working on a scheduling problem in which I have used two different MIP formulations and also based on the time index variable. My problem is in the class $ P_{j} | \ r_{j}, SDST \ | C_{Max} $. ...
1 vote
0 answers
87 views

Optimize cherry picking runs

I am trying to optimize a cherry picking procedure on 96-well microplates. The plates are 12X8 (12 columns, 8 rows). We pass a command file that has many lines like this to a robot: ...
2 votes
4 answers
131 views

How to fill the days in sequence?

I have a scheduling problem. 20 hours of work load should be assigned to different days (max 4 days are available and the capacity of ech day is 8 hours max) $\sum_i h_i = 20$ $0 \leq h_i \leq 8$ The ...
2 votes
1 answer
99 views

Formulation for choosing how many items to manufacture

I am working on a scheduler for a manufacturing plant. I have currently set it up so the decision variables are set up as binary variables: $x_{m,p,s}$ = 1 if machine m is running part p on shift s ...
1 vote
0 answers
82 views

Linearization of Conditional Constraints for MIP using Cplex

I'm currently working on a mixed-integer programming (MIP) problem and I'm trying to implement a set of conditional constraints in CPlex. These constraints involve decision variables that are indexed ...
2 votes
1 answer
212 views

Compute overlapping time

I am trying to solve an optimization problem in which there is a set of tasks, $S$, where $s_i$ and $e_i$ are the starting and ending time of task $i \in S$. Each task $i $ must be done within its ...
2 votes
2 answers
379 views

Scheduling to minimize total "wait to start" time

I have a scheduling problem I am trying to work through. As I was outlining the problem, I realized it is probably of a known problem type, but I am unsure of what keywords to search for or what ...
3 votes
1 answer
135 views

Meaning of the domain propagation in the context of mixed-integer programming

In the literature, domain propagation defines the process of inferring sequences of local domain reductions at the current node of the branch-and-bound tree. The goal is to shrink the size of the ...
1 vote
2 answers
233 views

Best algorithm for scheduling interviews

I posted the same question on stackoverflow and immediately referred to post it here. I want to think about the best algorithm which let the interviewer meet maximum number of candidates. Suppose that ...
0 votes
2 answers
111 views

Assignment problem with multiple precedence constraints

Objective and short problem description The objective is to load as many passenger vehicles as possible on an auto-train. The train consists of multiple wagons with two levels each. The wagons are ...
0 votes
1 answer
57 views

Help finding linear constraint - LP

I have the following question. I have two variables $w_{nds}$ and $m_{nd}$. The first variable indicates whether a nurse $n$ works shift $s$ on day $d$. The second one indicates the motivation of ...
4 votes
1 answer
92 views

Nurse Rostering constraints - LP

I am fairly new to linear programming since I came across this topic at university this semester. We mainly focus on nurse rostering. In the lecture, we created a very basic rostering model with an ...
2 votes
1 answer
64 views

Machine Scheduling with simultaneous processing of jobs

I am searching for a keyword that describes a machine scheduling problem in which machines are allowed to process multiple jobs at a time. Each job requires a given capacity on the machine. At any ...
1 vote
1 answer
90 views

Workforce scheduling MIP formulation

I am working on a large scale workforce scheduling problem with a large number of hard and soft constraints. The soft constraints are modeled as objectives with penalties for violating them. So my ...
7 votes
2 answers
284 views

CPLEX CP Optimizer Java API function missing

I can not seem to find the needed functions to model the following problem through the Java API (CP Optimizer): a machine that has downtime and sequence-dependent setup times, with the extra ...
1 vote
1 answer
581 views

About circuit constraints in OR - tools

I am trying to implement a scheduling problem to solve with CP-SAT from OR-tools. There, in particular, for every machine I want to add a time transition constraint from every task that is performed ...